Bayesian Predictive Control Chart
A Bayesian predictive control chart judges each new observation against the posterior predictive distribution built from all earlier in-control observations and a prior. Limits are predictive quantiles, so they are wide at the start of production and narrow as evidence accumulates; prior knowledge from similar processes can be built in. Normal measurements use a normal-inverse-gamma prior and Poisson counts a gamma prior.
베이즈 예측 관리도는 사전분포와 앞선 관리 상태 관측값으로 만든 사후 예측분포에 새 관측값을 비추어 판정합니다. 관리한계가 예측분포의 분위수이므로 생산 초기에는 넓고 자료가 쌓일수록 좁아지며, 비슷한 공정의 사전 지식을 반영할 수 있습니다. 연속 측정값은 정규-역감마 사전분포, 건수 자료는 감마 사전분포를 씁니다.
With only a few observations from a new process, or with prior knowledge from similar runs, how unusual is the latest value?
새 공정이라 관측값이 적거나 비슷한 공정의 사전 지식이 있을 때, 방금 나온 값은 얼마나 이례적입니까?
The method returns, for every point, the predictive centre, lower and upper limits and the two-sided predictive tail probability, flags points below the chosen false-alarm probability, and reports the posterior for the process mean and variance (or the event rate) together with the limits for the next observation.
When to use Bayesian Predictive Control Chart
- Start-up or short production runs where phase I data are too few for fixed limits.
- Prior information from similar processes should be combined with the current data.
- Counts of events per period (Poisson) or continuous measurements (normal).
When to use something else
- A long stable phase I is available and fixed limits suffice: use Individuals and Moving Range Chart
- You need to detect small persistent shifts: use EWMA Control Chart
- You only want to update a single mean once: use Bayesian Mean Update (Normal Prior, Known Variance)
Assumptions and requirements
- Independent observations from a normal or Poisson model
- A stable process during the points used for updating
- A prior that reflects genuine knowledge (or the default reference prior)
What the analysis reports
- Predictive limits and tail probability per point
- Signals and the first signal
- Posterior mean and spread of the process parameters
- Limits for the next observation
How to report it
A Bayesian predictive control chart (reference prior, alpha = [value]) flagged [value] of [value] points; the posterior mean of the process was [value].
Related methods
- Individuals and Moving Range Chart
- EWMA Control Chart
- Bayesian Mean Update (Normal Prior, Known Variance)
- Bayesian Event Rate Update (Gamma Prior)
How this method is validated
이 방법의 검증 근거
- Independent computation. 3 reference tests compare the results with SciPy and direct computations (formulas, enumeration or simulation) at a stated tolerance of 5e-4.
독립 계산. SciPy·직접 계산(식·열거·모의실험) 대조 참조 시험 3건 통과(허용오차 5e-4).
Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.
허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.
Run Bayesian Predictive Control Chart on Quorant
- Data you need
- a table (CSV or Excel) with a time variable and an outcome variable
- Price
- 400 credits for one analysis up to 10,000 rows (complexity level 3); larger or wider data costs more. Optional methodologist review: 1800 credits.
- Checking
- Compared with independent computations
- Before you pay
- A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.