Control Chart for Autocorrelated Data
A control chart for autocorrelated data monitors a serially correlated process either by charting one-step-ahead residuals of an ARMA model fitted to in-control data or by an EWMA with autocorrelation-adjusted limits (EWMAST).
자기상관 자료의 관리도는 관리 상태 자료에 ARMA 모형을 적합해 1기 앞 예측 잔차를 관리도로 그리거나, 자기상관을 반영해 관리한계를 넓힌 EWMA(EWMAST)로 계열 상관이 있는 공정을 감시하는 방법입니다.
My process measurements are strongly autocorrelated and my individuals chart gives constant false alarms; how should I build a control chart that accounts for the autocorrelation?
공정 측정값의 자기상관이 커서 개별값 관리도가 계속 거짓 경보를 냅니다. 자기상관을 고려한 관리도는 어떻게 만들어야 하나요?
Fit a time-series model such as AR(1) or a low-order ARMA to in-control phase I data, then chart the one-step-ahead residuals on an individuals and moving-range chart, because residuals of a correct model are roughly independent. Alternatively, an EWMAST chart keeps the original scale and widens the EWMA limits using the sample autocorrelations of the in-control data.
When to use Control Chart for Autocorrelated Data
- Successive measurements from a continuous or high-frequency process are clearly autocorrelated (lag-1 autocorrelation well above 0.2).
- A standard Shewhart or EWMA chart signals far more often than its nominal false-alarm rate on in-control data.
- You have an in-control phase I period long enough (at least 20 points, ideally 100 or more) to estimate an ARMA model.
When to use something else
- Observations are approximately independent; use a standard individuals, CUSUM or EWMA chart.
- The series has trends or seasonality that should be removed first; fit a full ARIMA or seasonal model and monitor its forecast errors.
Assumptions and requirements
- Phase I data are in control and stationary.
- The ARMA model (AR order up to max_order, MA order at most 1) captures the autocorrelation, so residuals are roughly uncorrelated.
- Residuals are approximately normal for the 3-sigma limits to have the usual false-alarm rate.
- Between 20 and 10,000 points; the model is estimated on at most the first 1,000 phase I points.
What the analysis reports
- Selected ARMA order, parameters and AIC
- Residual individuals and moving-range chart limits with signal points
- EWMAST centre line, autocorrelation-adjusted standard deviation and limits
- Lag-1 autocorrelation of the data and of the residuals, Ljung-Box and normality checks
How to report it
An ARIMA([p], 0, [q]) model fitted to [value] phase I points (lag-1 autocorrelation = [value]) left uncorrelated residuals (Ljung-Box p = [value]); the residual individuals chart first signalled at point [value] ([value] signals in [value] points).
Related methods
How this method is validated
이 방법의 검증 근거
- Independent computation. 1 reference test compares the results with reference values computed independently in the test suite.
독립 계산. 시험에서 따로 계산한 참조값 대조 참조 시험 1건 통과.
Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.
허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.
Run Control Chart for Autocorrelated Data on Quorant
- Data you need
- a table (CSV or Excel) with a time variable and an outcome variable
- Price
- 600 credits for one analysis up to 10,000 rows (complexity level 4); larger or wider data costs more. Optional methodologist review: 2400 credits.
- Checking
- Compared with independent computations
- Before you pay
- A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.