Methods · Time series · Forecasting

Croston Intermittent Demand Forecasting

Croston's method forecasts intermittent demand by separately smoothing non-zero demand sizes and the intervals between them, with the Syntetos-Boylan approximation correcting its upward bias.

Croston 방법은 간헐적 수요를 예측할 때 0이 아닌 수요량과 수요 사이 간격을 따로 평활하며, Syntetos-Boylan 근사로 위쪽 편향을 보정한다.

How should I forecast spare-part demand that is zero in most months?

대부분의 달에 수요가 0인 부품의 수요를 어떻게 예측해야 하나요?

Croston's method updates the demand size and inter-demand interval only when a demand occurs, and forecasts their ratio as the demand rate per period. The Syntetos-Boylan approximation multiplies that ratio by one minus half the smoothing constant to remove bias.

When to use Croston Intermittent Demand Forecasting

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

Croston's method (α = [value]) gave a demand rate of [value] per period; the Syntetos-Boylan corrected rate was [value].

Related methods

Run Croston Intermittent Demand Forecasting on Quorant

Data you need
a table (CSV or Excel) with a time variable and an outcome variable
Price
250 credits for one analysis up to 10,000 rows (complexity level 2); larger or wider data costs more. Optional methodologist review: 1200 credits.
Checking
Checked by property tests in every deployment
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q53022 · Reviewed 2026-10-25