Skip to content

Methods · Machine learning · Model stability

Decision Tree Instability (Bootstrap Stability) Analysis

Decision trees can change a lot when the data change slightly. This analysis refits the same tree on many bootstrap samples and measures how often each variable is chosen as the first split and used anywhere, how much the cutpoint moves, and how often the bootstrap trees' predictions agree with the original tree.

의사결정나무는 자료가 조금만 달라져도 크게 바뀔 수 있습니다. 같은 설정의 나무를 여러 붓스트랩 표본에 다시 적합해, 각 변수가 첫 분할과 전체 분할에 얼마나 자주 쓰이는지, 분할점이 얼마나 움직이는지, 붓스트랩 나무의 예측이 원래 나무와 얼마나 일치하는지를 잽니다.

If I collected a slightly different sample, would I get the same decision tree and the same predictions?

표본이 조금 달랐다면 같은 의사결정나무와 같은 예측을 얻었겠습니까?

A root variable chosen in most bootstrap trees and high prediction agreement mean the tree's story is reproducible. Many different root variables or low agreement mean the particular tree shown should not be over-interpreted; an ensemble may be preferable.

When to use Decision Tree Instability (Bootstrap Stability) Analysis

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

Across [value] bootstrap refits of the decision tree, the original root split variable [value] was chosen at the root in [value] of trees, and mean agreement with the original tree's predictions was [value].

Related methods

How this method is validated

이 방법의 검증 근거

  • Independent computation. 1 reference test compares the results with scikit-learn.

    독립 계산. scikit-learn 대조 참조 시험 1건 통과.

Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.

허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.

Run Decision Tree Instability (Bootstrap Stability) Analysis on Quorant

Data you need
a table (CSV or Excel) with an outcome variable and predictor (feature) columns
Price
600 credits for one analysis up to 10,000 rows (complexity level 4); larger or wider data costs more. Optional methodologist review: 2400 credits.
Checking
Compared with independent computations
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q71070 · Reviewed 2026-10-25