Skip to content

Methods · Survey sampling · Unequal probability estimation

Des Raj Ordered Estimator for PPS Sampling Without Replacement

When units are drawn one after another with probability proportional to size without replacement, the Des Raj estimator forms one unbiased estimate of the total from each draw, using the values already observed and the remaining selection probability, and averages them. The spread of these estimates gives an unbiased variance estimate.

크기에 비례하는 확률로 단위를 하나씩 비복원 추출했을 때, 데스 라지 추정량은 이미 관측한 값과 남은 추출확률을 이용해 뽑을 때마다 총계의 비편향 추정치를 하나씩 만들고 이를 평균합니다. 이 추정치들의 퍼짐으로 비편향 분산 추정치도 얻습니다.

We drew hospitals one at a time with probability proportional to beds and without replacement; how do we estimate total admissions and its standard error?

병상 수에 비례하는 확률로 병원을 하나씩 비복원 추출했는데, 전체 입원 건수와 그 표준오차를 어떻게 추정합니까?

The method returns the estimated total (and mean when the population size is given) with its standard error, confidence interval and the component estimate from each draw.

When to use Des Raj Ordered Estimator for PPS Sampling Without Replacement

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

From n = [n] units drawn with probability proportional to size without replacement, the Des Raj estimate of the total was [value] (SE = [value], 95% CI [value] to [value]).

Related methods

How this method is validated

이 방법의 검증 근거

  • Independent computation. 1 reference test compares the results with direct computations (formulas, enumeration or simulation) at a stated tolerance of 1e-9.

    독립 계산. 직접 계산(식·열거·모의실험) 대조 참조 시험 1건 통과(허용오차 1e-9).

Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.

허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.

Run Des Raj Ordered Estimator for PPS Sampling Without Replacement on Quorant

Data you need
a table (CSV or Excel) with an outcome variable and predictor (feature) columns
Price
250 credits for one analysis up to 10,000 rows (complexity level 2); larger or wider data costs more. Optional methodologist review: 1200 credits.
Checking
Compared with independent computations
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q46025 · Reviewed 2026-10-25