Expected Hypervolume Improvement (Two-Objective Bayesian Optimization)
Expected hypervolume improvement chooses the next experiment when two objectives must be balanced. A Gaussian-process surrogate predicts each objective; the hypervolume is the area dominated by the current Pareto front up to a reference point, and the expected improvement of that area under the predictive distribution is computed exactly for each candidate setting.
기대 초부피 개선은 두 목적을 함께 고려해야 할 때 다음 실험을 고르는 방법입니다. 가우스과정 대리모형으로 각 목적을 예측하고, 현재 파레토 전선이 기준점까지 지배하는 면적을 초부피로 정의한 뒤, 예측분포 아래에서 이 면적의 기대 증가량을 후보 설정마다 정확히 계산합니다.
Given the experiments done so far, which settings should be tried next to improve the trade-off between two objectives?
지금까지의 실험을 바탕으로 두 목적 사이의 절충을 개선하려면 다음에 어떤 설정을 시험해야 할까요?
The method fits a surrogate per objective, reports the current Pareto front and its hypervolume, and ranks candidate settings by expected hypervolume improvement with their predicted objective values and uncertainties. Candidates are your untested rows or points searched across the factor ranges.
When to use Expected Hypervolume Improvement (Two-Objective Bayesian Optimization)
- Each experiment is expensive and two objectives conflict (for example yield and cost).
- You want a principled next run rather than a grid.
- There are up to ten continuous factors.
When to use something else
- There is a single objective: use Bayesian Optimization (Gaussian-Process Sequential Design)
- You only need to model one response from completed runs: use Gaussian Process Regression
- Factors have two levels each and a fixed design is planned: use Two Level Factorial Design Analysis
Assumptions and requirements
- Each objective is smooth in the factors
- Objectives are modelled independently
- The reference point bounds the region of interest
What the analysis reports
- Current Pareto front and hypervolume
- Candidates ranked by EHVI with predicted means and SDs
- Proposed next run
- Scatter of observed objectives
How to report it
Two Gaussian-process surrogates were fitted to [value] runs; the Pareto front had [value] points with hypervolume [value]. The candidate with the largest expected hypervolume improvement ([value]) was [value].
Related methods
- Bayesian Optimization (Gaussian-Process Sequential Design)
- Gaussian Process Regression
- Explained Variance Score
- Extreme Learning Machine
How this method is validated
이 방법의 검증 근거
- Independent computation. 1 reference test compares the results with direct computations (formulas, enumeration or simulation).
독립 계산. 직접 계산(식·열거·모의실험) 대조 참조 시험 1건 통과.
Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.
허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.
Run Expected Hypervolume Improvement (Two-Objective Bayesian Optimization) on Quorant
- Data you need
- a table (CSV or Excel) with predictor (feature) columns and outputs
- Price
- 600 credits for one analysis up to 10,000 rows (complexity level 4); larger or wider data costs more. Optional methodologist review: 2400 credits.
- Checking
- Compared with independent computations
- Before you pay
- A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.