Fuzzy Regression Discontinuity
Fuzzy regression discontinuity: crossing the cutoff changes the probability of take-up recorded in a column you name, and the cutoff is used as an instrument.
퍼지 회귀 불연속 — 기준점을 넘으면 지정한 열의 처리 수용 확률이 바뀌고 기준점을 도구변수로 쓰는 퍼지 회귀 불연속입니다.
Runs Regression Discontinuity Design (RDD) with: .
기본 방법(Regression Discontinuity Design (RDD))에 다음 설정을 고정해 실행합니다: .
Not everyone above the score threshold received the programme; how do I estimate its effect?
점수 기준을 넘은 사람이 모두 프로그램을 받지는 않았는데, 효과를 어떻게 추정하나요?
The fuzzy design divides the jump in outcomes by the jump in take-up at the cutoff. It runs Regression Discontinuity Design (RDD) with takeup (take-up column) supplied as an extra input; checks and report follow Regression Discontinuity Design (RDD).
When to use Fuzzy Regression Discontinuity
- Treatment take-up is incomplete at the threshold.
- You have a take-up indicator.
When to use something else
- Take-up jumps from 0 to 1 at the cutoff; the sharp design applies.
- You have nothing to give for takeup; Regression Discontinuity Design (RDD) runs without it.
What you still provide
- Data: a table (CSV or Excel) with an outcome variable and running.
- takeup (take-up column)
Assumptions and requirements
The same as for Regression Discontinuity Design (RDD):
- Units cannot precisely manipulate the running variable around the cutoff
- Other covariates are continuous at the cutoff
- Correct functional form within the bandwidth (local linear fitting)
- Sufficient data near the threshold
What the analysis reports
The output of Regression Discontinuity Design (RDD), with the preset shown in the settings:
- Local treatment effect at the cutoff with robust confidence interval
- Optimal bandwidth
- RD plot with binned means
- Density (manipulation) test
- Covariate balance and placebo cutoff tests
- Optional fuzzy design from a treatment take-up column: first-stage jump and F, reduced-form jump, local Wald estimate with robust (HC1) standard error and confidence interval, and a weak-instrument-robust Anderson-Rubin interval
- Optional Imbens-Kalyanaraman MSE-optimal bandwidth with the triangular-kernel local linear estimate at that bandwidth and a robust bias-corrected confidence interval at the same bandwidth
How this is validated
검증 근거
This variant runs the same engine as Regression Discontinuity Design (RDD) with the settings above fixed, so the evidence is that method’s: compared with independent computations. No separate checks of this preset are claimed. Read the base method’s validation record.
이 설정 묶음은 Regression Discontinuity Design (RDD)와 같은 엔진으로 돕니다. 검증 근거는 기본 방법의 것이며, 이 설정만 따로 검증했다고 주장하지 않습니다.
Run this variant
- Data you need
- a table (CSV or Excel) with an outcome variable and running
- Price
- Same as Regression Discontinuity Design (RDD): 250 credits for one analysis up to 10,000 rows (complexity level 2); larger or wider data costs more. Optional methodologist review: 1200 credits.
- Checking
- Compared with independent computations, as recorded for Regression Discontinuity Design (RDD) (see its checks)
- Before you pay
- A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.