GEE m-dependent working correlation
Working correlation that is nonzero only up to lag m, with a separate value per lag.
GEE m-의존 작업상관 — 시차 m까지만 0이 아니고 시차마다 다른 값을 갖는 작업상관입니다.
Runs Generalized Estimating Equations (GEE) with: corr set to “mdep”.
기본 방법(Generalized Estimating Equations (GEE))에 다음 설정을 고정해 실행합니다: corr = mdep.
Monthly measurements are correlated only with the next two months; which GEE working correlation fits that?
월별 측정값이 다음 두 달과만 상관되는데, 어떤 GEE 작업상관이 맞나요?
The m-dependent structure lets correlation be nonzero only up to lag m, with a separate value at each lag. Behind it is Generalized Estimating Equations (GEE) with corr = mdep already set and mdep supplied by you; checks and report are the same as for Generalized Estimating Equations (GEE).
When to use GEE m-dependent working correlation
- Measurements are equally spaced and correlation dies out after a few lags.
- An AR(1) structure decays too quickly or too slowly for your data.
When to use something else
- Measurements are unequally spaced; lags are then not comparable.
- You want to try other settings side by side; open Generalized Estimating Equations (GEE) and set the options yourself.
What you still provide
- Data: a table (CSV or Excel) with an outcome variable, a cluster ID and predictor (feature) columns.
- mdep
Assumptions and requirements
The same as for Generalized Estimating Equations (GEE):
- Correctly specified mean model and link function
- Clusters independent of one another
- Enough clusters for robust standard errors to be reliable
- Data missing completely at random, or weighted GEE otherwise
What the analysis reports
The output of Generalized Estimating Equations (GEE), with the preset shown in the settings:
- Coefficients with robust standard errors, Wald tests and 95% confidence intervals
- Odds ratios (binomial) or rate ratios (Poisson) with 95% confidence intervals
- Estimated working correlation (exchangeable, independence, AR(1) or unstructured)
- QIC and QICu, with QIC compared across all four working-correlation structures
How this is validated
검증 근거
This variant runs the same engine as Generalized Estimating Equations (GEE) with the settings above fixed, so the evidence is that method’s: results cross-checked against r. No separate checks of this preset are claimed. Read the base method’s validation record.
이 설정 묶음은 Generalized Estimating Equations (GEE)와 같은 엔진으로 돕니다. 검증 근거는 기본 방법의 것이며, 이 설정만 따로 검증했다고 주장하지 않습니다.
Other variants of Generalized Estimating Equations (GEE)
- GEE fixed user correlation
- GEE Type 3 generalized score tests
- Gamma GEE
- Inverse Gaussian GEE
- Negative binomial GEE
- Population-averaged probit (GEE)
- Population-averaged complementary log-log (GEE)
- GEE with AR(k) working correlation
- GEE with nonstationary working correlation
- GEE with Mancl-DeRouen small-sample SE
- GEE with Kauermann-Carroll small-sample SE
- GEE with Fay-Graubard small-sample SE
Run this variant
- Data you need
- a table (CSV or Excel) with an outcome variable, a cluster ID and predictor (feature) columns
- Price
- Same as Generalized Estimating Equations (GEE): 400 credits for one analysis up to 10,000 rows (complexity level 3); larger or wider data costs more. Optional methodologist review: 1800 credits.
- Checking
- Results cross-checked against R, as recorded for Generalized Estimating Equations (GEE) (see its checks)
- Before you pay
- A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.