Skip to content

Methods · Causal inference · Regression discontinuity

Geographic Regression Discontinuity (Boundary RD)

A geographic regression discontinuity compares units just on either side of an administrative or natural boundary that switches a treatment on, using distance to the boundary as the running variable.

지리적 회귀불연속은 처치를 켜는 행정 경계나 자연 경계 바로 양쪽의 단위를 비교하며, 경계까지의 거리를 배정변수로 사용하는 설계입니다.

Does a policy that applies on one side of a border change outcomes for people living right next to the border?

경계 한쪽에서만 시행되는 정책이 경계 바로 옆에 사는 사람들의 결과를 바꿀까요?

The method computes each unit's perpendicular distance to the boundary line you supply, signs it by side, and fits a local linear discontinuity with a triangular kernel and robust standard errors, optionally with boundary-segment fixed effects. It also estimates separate discontinuities at points along the boundary from regressions on the distance to each point, so you can see whether the effect varies along the border.

When to use Geographic Regression Discontinuity (Boundary RD)

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

Within [value] km of the boundary, the discontinuity in [outcome] was [value] (SE [value], 95% CI [value], [value]); estimates at [value] boundary points ranged from [value] to [value].

Related methods

How this method is validated

이 방법의 검증 근거

  • Independent computation. 1 reference test compares the results with statsmodels at a stated tolerance of 1e-3.

    독립 계산. statsmodels 대조 참조 시험 1건 통과(허용오차 1e-3).

Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.

허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.

Run Geographic Regression Discontinuity (Boundary RD) on Quorant

Data you need
a table (CSV or Excel) with an outcome variable, a treatment indicator, lat and lon
Price
400 credits for one analysis up to 10,000 rows (complexity level 3); larger or wider data costs more. Optional methodologist review: 1800 credits.
Checking
Compared with independent computations
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q81087 · Reviewed 2026-10-25