Skip to content

Methods · Meta-analysis · MASEM

Meta-Analytic Structural Equation Modeling (Two-Stage SEM)

Two-stage meta-analytic structural equation modeling first pools correlation matrices across studies and then fits a path or factor model to the pooled matrix, weighting by its sampling covariance.

2단계 메타분석 구조방정식모형은 연구들의 상관행렬을 먼저 통합한 뒤 그 표집 공분산으로 가중해 통합 행렬에 경로모형이나 요인모형을 적합하는 방법입니다.

Different studies report correlations among the same set of constructs; how can I test a path model using all of them together?

여러 연구가 같은 구성개념들 사이의 상관을 보고하는데, 이를 모두 써서 경로모형을 검정하려면 어떻게 하나요?

Stage 1 combines the study correlations by multivariate generalized least squares, with optional random effects for between-study heterogeneity, giving a pooled matrix and its covariance. Stage 2 fits the specified standardised path or confirmatory factor model to that matrix by weighted least squares and reports parameters with standard errors and fit indices.

When to use Meta-Analytic Structural Equation Modeling (Two-Stage SEM)

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

Pooling correlations from [value] studies (N = [value]) and fitting the path model by WLS gave χ²([value]) = [value], p = [value], RMSEA = [value], CFI = [value]; the path from X to Y was [value] (SE = [value]).

Related methods

How this method is validated

이 방법의 검증 근거

  • Automated tests. Checked by automated run tests; no external reference comparison is recorded yet.

    자동 시험. 자동 실행 시험을 거칩니다. 외부 참조값과 대조한 기록은 아직 없습니다.

Run Meta-Analytic Structural Equation Modeling (Two-Stage SEM) on Quorant

Data you need
a table (CSV or Excel) with an outcome variable, predictor (feature) columns and a unit (entity) ID
Price
900 credits for one analysis up to 10,000 rows (complexity level 5); larger or wider data costs more. Optional methodologist review: 3600 credits.
Checking
Automated run tests; no external reference comparison yet
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q82016 · Reviewed 2026-10-25