Skip to content

Methods · Network analysis · Network resilience

Network Robustness and Percolation Analysis

Network robustness analysis removes nodes at random or in targeted centrality order and tracks the giant component and global efficiency, summarised by the robustness index R and critical fractions.

연결망 강건성 분석은 마디를 무작위로 또는 중심성 순서로 지우며 가장 큰 덩어리와 전역 효율을 추적하고 강건성 지수 R 과 임계 비율로 요약하는 방법입니다.

How many key hubs would have to fail before our supply network falls apart?

핵심 허브가 몇 개 무너져야 우리 공급망이 쪼개지나요?

Nodes are removed one by one, randomly or by recalculated degree or betweenness, and the relative size of the largest connected component is recorded after each removal; the area under that curve is the robustness index R. The fraction at which the second-largest component peaks marks the empirical breakdown point, compared with the Molloy-Reed threshold for random failure. Betweenness attacks are limited to 1,000 nodes (dropped above 500 when all strategies are run) and use sampled or periodically recomputed betweenness in larger networks, and random-failure replicates are reduced for large networks.

When to use Network Robustness and Percolation Analysis

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

Sequential node removal gave robustness indices R_random = [value], R_degree = [value] and R_betweenness = [value]; the Molloy-Reed critical fraction for random failure was [value].

Related methods

How this method is validated

이 방법의 검증 근거

  • Independent computation. 1 reference test compares the results with NetworkX.

    독립 계산. NetworkX 대조 참조 시험 1건 통과.

Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.

허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.

Run Network Robustness and Percolation Analysis on Quorant

Data you need
a table (CSV or Excel) with predictor (feature) columns
Price
400 credits for one analysis up to 10,000 rows (complexity level 3); larger or wider data costs more. Optional methodologist review: 1800 credits.
Checking
Compared with independent computations
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q63017 · Reviewed 2026-10-25