Skip to content

Methods · Quality control · Process capability

Non-Normal Process Capability

Non-normal process capability analysis estimates Pp, Ppk and expected nonconforming parts per million for skewed data, either by fitting a distribution and using its percentiles or by transforming data and limits to normality.

비정규 공정능력 분석은 치우친 자료에 분포를 적합해 백분위수를 쓰거나 자료와 규격한계를 정규로 변환해 Pp, Ppk 와 예상 불량 PPM 을 추정하는 방법입니다.

My measurements are right-skewed and fail a normality test; how do I compute a valid Ppk and the expected defect rate against my specification limits?

측정값이 오른쪽으로 치우쳐 정규성 검정을 통과하지 못하는데, 규격한계에 대한 Ppk 와 예상 불량률을 어떻게 제대로 계산하나요?

Fit a suitable distribution such as Weibull, lognormal, gamma or log-logistic and replace μ ± 3σ by its 0.135% and 99.865% percentiles and μ by the median (the ISO 22514-2 percentile method), or transform the data and limits with Box-Cox or Johnson curves and compute the indices on the normal scale. The expected PPM comes from the fitted tails beyond the limits, and the Anderson–Darling statistic shows how well the chosen model fits.

When to use Non-Normal Process Capability

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

Because the measurements were not normally distributed (Shapiro–Wilk W = [value], p [value]), capability was assessed with the [distribution] percentile method (n = [value]): Ppk = [value], Pp = [value], expected nonconforming = [value] PPM.

Related methods

How this method is validated

이 방법의 검증 근거

  • Independent computation. 1 reference test compares the results with SciPy and direct computations (formulas, enumeration or simulation).

    독립 계산. SciPy·직접 계산(식·열거·모의실험) 대조 참조 시험 1건 통과.

Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.

허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.

Run Non-Normal Process Capability on Quorant

Data you need
a table (CSV or Excel) with an outcome variable
Price
400 credits for one analysis up to 10,000 rows (complexity level 3); larger or wider data costs more. Optional methodologist review: 1800 credits.
Checking
Compared with independent computations
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q01003 · Reviewed 2026-10-25