Order Quantity with Planned Shortages
Order quantity and planned backorder level when shortages are allowed at a cost.
계획 결품을 허용하는 주문량 — 비용을 치르고 결품을 허용할 때의 주문량과 계획 결품 수준을 구합니다.
Runs Economic order quantity calculator with: model set to “backorder”.
기본 방법(Economic order quantity calculator)에 다음 설정을 고정해 실행합니다: model = backorder.
Customers will wait for backorders at a small cost; how much should we order?
고객이 약간의 비용으로 이월 주문을 기다려 주는데, 얼마나 주문해야 하나요?
The model balances ordering, holding and shortage costs. The entry opens the Economic order quantity calculator with model = backorder fixed.
When to use Order Quantity with Planned Shortages
- Customers accept backorders.
- Shortage cost per unit time is known.
When to use something else
- Shortages mean lost sales; the backorder model does not apply.
- You want to try other settings side by side; open the Economic order quantity calculator and set the options yourself.
What you still provide
- Data: the summary numbers the calculator asks for; no data file.
How this is validated
검증 근거
This preset fills in settings of the Economic order quantity calculator; the calculation is that calculator’s. No separate checks of this preset are claimed.
이 설정 묶음은 Economic order quantity calculator의 설정을 채워 둔 것입니다. 계산은 그 계산기와 같으며, 이 설정만 따로 검증했다고 주장하지 않습니다.
Other variants of Economic order quantity calculator
Run this variant
- Data you need
- the summary numbers the calculator asks for; no data file
- Price
- Free in the browser calculator; no credits are used.
- Checking
- Uses the same calculator as the Economic order quantity calculator; no separate validation record is published for this preset.