Skip to content

Methods · Meta-analysis · Publication bias

P-Curve Analysis

P-curve analysis examines the distribution of statistically significant p-values from a set of studies. If the studied effects are real, small p-values are more common than p-values just below .05 (a right-skewed curve); if findings come mainly from selective reporting, the curve is flat or left-skewed.

P-곡선 분석은 여러 연구에서 보고된 유의한 p값의 분포를 살펴, 실제 효과가 있으면 작은 p값이 더 많아지는 오른쪽 치우침이 나타나는지로 결과의 증거 가치를 판단하는 방법이다.

Does a set of published significant findings contain evidential value, or could it be explained by selective reporting alone?

발표된 유의한 결과들이 선택적 보고만으로 설명되는지, 실제 효과의 증거를 담고 있는지 어떻게 판단하나요?

P-curve converts each significant test statistic into a pp-value and combines them with Stouffer's method. The right-skew test asks whether the curve is steeper than under no effect, and the flatness test asks whether it is flatter than expected if studies had only 33% power. The analysis also estimates the average power of the studies.

When to use P-Curve Analysis

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

P-curve analysis of [value] significant results showed a right-skewed curve (full: Z = [value], p = [value]; half: Z = [value], p = [value]), and the curve was not flatter than 33% power (Z = [value], p = [value]); estimated average power was [value]%.

Common variants

자주 쓰는 설정

The same analysis with settings already chosen. Each runs P-Curve Analysis itself, at the same price.

Related methods

How this method is validated

이 방법의 검증 근거

  • Independent computation. 1 reference test compares the results with direct computations (formulas, enumeration or simulation) at a stated tolerance of 1e-6.

    독립 계산. 직접 계산(식·열거·모의실험) 대조 참조 시험 1건 통과(허용오차 1e-6).

Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.

허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.

Run P-Curve Analysis on Quorant

Data you need
a table (CSV or Excel) with an outcome variable
Price
400 credits for one analysis up to 10,000 rows (complexity level 3); larger or wider data costs more. Optional methodologist review: 1800 credits.
Checking
Compared with independent computations
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q82020 · Reviewed 2026-10-25