Skip to content

Methods · Robust & resampling methods · Resampling

Parametric Bootstrap (Likelihood-Ratio Test and Confidence Intervals)

A parametric bootstrap simulates new data sets from a fitted model and refits the model to each, giving the null distribution of a likelihood-ratio statistic or the sampling distribution of an estimate.

모수적 부트스트랩은 적합한 모형에서 새 자료를 모의해 매번 모형을 다시 적합함으로써 우도비 통계량의 영분포나 추정량의 표집분포를 얻는 방법입니다.

I want to test whether a negative binomial model fits my counts better than a Poisson model, but the usual chi-square test is not valid at the boundary; what should I do?

개수 자료에서 음이항 모형이 포아송 모형보다 나은지 검정하고 싶은데, 경계 문제 때문에 보통의 카이제곱 검정을 쓸 수 없다면 어떻게 하나요?

Fit the Poisson model, simulate many count data sets from it, fit both models to each simulated set and record the likelihood-ratio statistic. The share of simulated statistics at least as large as the observed one is the bootstrap p value, which is valid even though the dispersion parameter sits on the boundary under the null.

When to use Parametric Bootstrap (Likelihood-Ratio Test and Confidence Intervals)

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

A parametric bootstrap likelihood-ratio test ([value] replicates) comparing a Poisson with a negative binomial model gave LR = [value], bootstrap p = [value].

Related methods

How this method is validated

이 방법의 검증 근거

  • Automated tests. Checked by automated run tests; no external reference comparison is recorded yet.

    자동 시험. 자동 실행 시험을 거칩니다. 외부 참조값과 대조한 기록은 아직 없습니다.

Run Parametric Bootstrap (Likelihood-Ratio Test and Confidence Intervals) on Quorant

Data you need
a table (CSV or Excel) with an outcome variable and predictor (feature) columns
Price
400 credits for one analysis up to 10,000 rows (complexity level 3); larger or wider data costs more. Optional methodologist review: 1800 credits.
Checking
Automated run tests; no external reference comparison yet
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q13013 · Reviewed 2026-10-25