Skip to content

Methods · Hypothesis testing · Mean comparison · Planned Contrasts and Polynomial Trend Analysis

Planned Contrasts with Welch–Satterthwaite Degrees of Freedom

Tests planned contrasts with Welch–Satterthwaite degrees of freedom, so each contrast does not assume equal group variances.

Welch–Satterthwaite 자유도 계획 대비 — 각 대비가 집단 분산이 같다고 가정하지 않도록 Welch–Satterthwaite 자유도로 계획 대비를 검정합니다.

Runs Planned Contrasts and Polynomial Trend Analysis with: welch set to “on”.

기본 방법(Planned Contrasts and Polynomial Trend Analysis)에 다음 설정을 고정해 실행합니다: welch = on.

My groups have very different variances; how do I test planned contrasts?

집단 분산이 크게 다른데, 계획 대비는 어떻게 검정하나요?

Each contrast gets its own standard error and approximate degrees of freedom from the group variances involved. Behind it is Planned Contrasts and Polynomial Trend Analysis with welch = true already set; checks and report are the same as for Planned Contrasts and Polynomial Trend Analysis.

When to use Planned Contrasts with Welch–Satterthwaite Degrees of Freedom

When to use something else

What you still provide

Assumptions and requirements

The same as for Planned Contrasts and Polynomial Trend Analysis:

What the analysis reports

The output of Planned Contrasts and Polynomial Trend Analysis, with the preset shown in the settings:

How this is validated

검증 근거

This variant runs the same engine as Planned Contrasts and Polynomial Trend Analysis with the settings above fixed, so the evidence is that method’s: compared with independent computations. No separate checks of this preset are claimed. Read the base method’s validation record.

이 설정 묶음은 Planned Contrasts and Polynomial Trend Analysis와 같은 엔진으로 돕니다. 검증 근거는 기본 방법의 것이며, 이 설정만 따로 검증했다고 주장하지 않습니다.

Other variants of Planned Contrasts and Polynomial Trend Analysis

Run this variant

Data you need
a table (CSV or Excel) with an outcome variable and a grouping variable
Price
Same as Planned Contrasts and Polynomial Trend Analysis: 250 credits for one analysis up to 10,000 rows (complexity level 2); larger or wider data costs more. Optional methodologist review: 1200 credits.
Checking
Compared with independent computations, as recorded for Planned Contrasts and Polynomial Trend Analysis (see its checks)
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Preset ID Q11071-V02 · Variant of Q11071 · Reviewed 2026-10-25