Point-Biserial Correlation
Point-biserial correlation is a correlation coefficient measuring the strength and direction of association between a continuous variable and a binary variable, equal to Pearson's r with the binary variable coded 0/1.
점이연 상관계수는 연속형 변수와 이분형 변수 사이 연관의 강도와 방향을 나타내는 상관계수로, 이분형 변수를 0과 1로 코딩해 구한 피어슨 상관계수와 같다.
How do I measure the correlation between a continuous score and a two-category variable?
연속형 점수와 두 범주로 된 변수 사이의 상관은 어떻게 구하나요?
The point-biserial correlation quantifies how strongly a continuous variable differs between the two categories of a dichotomous variable, on the familiar −1 to +1 scale. Its significance test is mathematically equivalent to the pooled-variance independent-samples t-test, so it is often reported as an effect size for a two-group comparison.
When to use Point-Biserial Correlation
- One continuous variable and one naturally dichotomous variable, such as treatment versus control
- Expressing a two-group mean difference as a correlation-type effect size
- Item analysis, correlating a correct/incorrect item with a total score
When to use something else
- The binary variable is an artificial split of an underlying continuous trait: use the biserial correlation
- Ordinal or strongly non-normal continuous variable: use the Mann-Whitney U test with a rank-biserial correlation
Assumptions and requirements
- Exactly two categories in the binary variable
- Continuous variable approximately normal within each category, with similar variances
- Independent observations
What the analysis reports
- Point-biserial r, positive when the second category in sorted order has the higher mean
- Two-sided p-value
- Box plot of the continuous variable by category
How to report it
There was a significant point-biserial correlation between [binary variable] and [continuous variable], r_pb([df]) = [value], p = [value].
Related methods
Run Point-Biserial Correlation on Quorant
- Data you need
- a table (CSV or Excel) with an outcome variable and a grouping variable
- Price
- 150 credits for one analysis up to 10,000 rows (complexity level 1); larger or wider data costs more. Optional methodologist review: 900 credits.
- Checking
- Checked by property tests in every deployment
- Before you pay
- A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.