Production Function (Olley–Pakes)
Production function estimation by Olley–Pakes, using investment as a proxy for unobserved productivity.
생산함수(Olley–Pakes) — 관측되지 않는 생산성의 대리 변수로 투자를 쓰는 Olley–Pakes 생산함수 추정입니다.
Runs Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF) with: method set to “op”.
기본 방법(Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF))에 다음 설정을 고정해 실행합니다: method = op.
How do I estimate output elasticities when firms choose inputs knowing their productivity?
기업이 생산성을 알고 투입을 고를 때 산출 탄력성을 어떻게 추정하나요?
Olley–Pakes inverts investment to control for productivity, removing simultaneity bias. Technically this is Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF) with method = op fixed; nothing else about the analysis changes.
When to use Production Function (Olley–Pakes)
- Firm-level panels with positive investment for most observations.
- Simultaneity between inputs and productivity is a concern.
When to use something else
- Many zero-investment observations; Levinsohn–Petrin uses intermediate inputs instead.
- You would rather keep every option open; Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF) gives you the full set.
What you still provide
- Data: a table (CSV or Excel) with an outcome variable, predictor (feature) columns, a unit (entity) ID and a time variable.
Assumptions and requirements
The same as for Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF):
- Proxy strictly increasing in productivity given capital
- Productivity follows a first-order Markov process
- Capital is chosen one period ahead
- The Olley-Pakes exit (survival) correction is not included
What the analysis reports
The output of Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF), with the preset shown in the settings:
- Elasticities of the free and state inputs
- Returns to scale
- Log TFP by firm-year
- Cluster-bootstrap standard errors
How this is validated
검증 근거
This variant runs the same engine as Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF) with the settings above fixed, so the evidence is that method’s: automated run tests; no external reference comparison yet. No separate checks of this preset are claimed. Read the base method’s validation record.
이 설정 묶음은 Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF)와 같은 엔진으로 돕니다. 검증 근거는 기본 방법의 것이며, 이 설정만 따로 검증했다고 주장하지 않습니다.
Other variants of Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF)
Run this variant
- Data you need
- a table (CSV or Excel) with an outcome variable, predictor (feature) columns, a unit (entity) ID and a time variable
- Price
- Same as Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF): 900 credits for one analysis up to 10,000 rows (complexity level 5); larger or wider data costs more. Optional methodologist review: 3600 credits.
- Checking
- Automated run tests; no external reference comparison yet, as recorded for Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF) (see its checks)
- Before you pay
- A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.