Skip to content

Methods · Panel econometrics · Productivity · Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF)

Production Function (Olley–Pakes)

Production function estimation by Olley–Pakes, using investment as a proxy for unobserved productivity.

생산함수(Olley–Pakes) — 관측되지 않는 생산성의 대리 변수로 투자를 쓰는 Olley–Pakes 생산함수 추정입니다.

Runs Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF) with: method set to “op”.

기본 방법(Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF))에 다음 설정을 고정해 실행합니다: method = op.

How do I estimate output elasticities when firms choose inputs knowing their productivity?

기업이 생산성을 알고 투입을 고를 때 산출 탄력성을 어떻게 추정하나요?

Olley–Pakes inverts investment to control for productivity, removing simultaneity bias. Technically this is Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF) with method = op fixed; nothing else about the analysis changes.

When to use Production Function (Olley–Pakes)

When to use something else

What you still provide

Assumptions and requirements

The same as for Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF):

What the analysis reports

The output of Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF), with the preset shown in the settings:

How this is validated

검증 근거

This variant runs the same engine as Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF) with the settings above fixed, so the evidence is that method’s: automated run tests; no external reference comparison yet. No separate checks of this preset are claimed. Read the base method’s validation record.

이 설정 묶음은 Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF)와 같은 엔진으로 돕니다. 검증 근거는 기본 방법의 것이며, 이 설정만 따로 검증했다고 주장하지 않습니다.

Other variants of Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF)

Run this variant

Data you need
a table (CSV or Excel) with an outcome variable, predictor (feature) columns, a unit (entity) ID and a time variable
Price
Same as Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF): 900 credits for one analysis up to 10,000 rows (complexity level 5); larger or wider data costs more. Optional methodologist review: 3600 credits.
Checking
Automated run tests; no external reference comparison yet, as recorded for Production Function Estimation (Olley-Pakes, Levinsohn-Petrin, ACF) (see its checks)
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Preset ID Q52013-V02 · Variant of Q52013 · Reviewed 2026-10-25