Progressive Mean (PM) Control Chart
The method monitors a process mean with the progressive mean, the average of all observations from the start up to the current point. Each progressive mean is compared with limits around the in-control mean that narrow over time, by default faster than the standard error, so that the chart keeps reacting to persistent small shifts. The width constant can be given or calibrated by simulation to a chosen in-control average run length. The in-control mean and standard deviation can be given or estimated from an initial phase I sample.
점진 평균, 곧 시작부터 현재 시점까지 모든 관측값의 평균으로 공정 평균을 감시합니다. 각 점진 평균을 관리 상태 평균 둘레의 관리한계와 비교하는데, 기본 설정에서 이 한계는 표준오차보다 빠르게 시간이 갈수록 좁아져 작고 지속적인 이동에 계속 반응하게 합니다. 한계 폭 상수는 직접 주거나 원하는 관리 상태 평균런길이에 맞추어 모의실험으로 보정할 수 있습니다. 관리 상태 평균과 표준편차는 직접 주거나 처음의 1단계 표본에서 추정할 수 있습니다.
Has the mean of my process drifted by a small but persistent amount since monitoring began?
감시를 시작한 이후 내 공정의 평균이 작지만 지속적으로 이동했습니까?
The method returns the progressive mean and limits at every point, the points outside the limits and the first signal, the chart constant and how it was obtained with the simulated in-control average run length, and the in-control parameters used.
When to use Progressive Mean (PM) Control Chart
- You monitor individual observations and expect small sustained shifts in the mean.
- Shifts are likely to start early in the monitoring period.
- You want a simple memory-type chart as an alternative to CUSUM or EWMA.
When to use something else
- Large sudden shifts are the main concern and you want a chart with tunable memory: use EWMA Control Chart
- You want a chart that also locates the change point of a small shift: use CUSUM Control Chart
- Several correlated variables are monitored together: use Multivariate Control Chart (Hotelling T² and MEWMA)
Assumptions and requirements
- Observations are independent and approximately normal when in control
- The in-control mean and standard deviation are known or well estimated
What the analysis reports
- Progressive mean and control limits by time
- Out-of-control points and first signal
- Chart constant and simulated in-control ARL
- In-control parameters
How to report it
A progressive mean chart with limits [value] +- [value] sigma / t^0.7 (in-control ARL [value]) signalled first at observation [value].
Related methods
How this method is validated
이 방법의 검증 근거
- Independent computation. 2 reference tests compare the results with direct computations (formulas, enumeration or simulation).
독립 계산. 직접 계산(식·열거·모의실험) 대조 참조 시험 2건 통과.
Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.
허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.
Run Progressive Mean (PM) Control Chart on Quorant
- Data you need
- a table (CSV or Excel) with an outcome variable
- Price
- 250 credits for one analysis up to 10,000 rows (complexity level 2); larger or wider data costs more. Optional methodologist review: 1200 credits.
- Checking
- Compared with independent computations
- Before you pay
- A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.