Skip to content

Methods · Time series · Forecast evaluation

Theil's U Forecast Accuracy Statistics

Theil's U statistics measure forecast accuracy relative to the size of the series (U1, bounded between 0 and 1) or relative to a no-change forecast (U2), and Theil's decomposition splits the mean squared error into bias, variance and covariance proportions.

Theil U 통계량은 예측 정확도를 계열의 크기에 견주어(U1, 0과 1 사이) 또는 변화 없음 예측에 견주어(U2) 나타내고, Theil 분해로 평균제곱오차를 편향·분산·공분산 비율로 나누는 지표입니다.

Our forecasts look reasonable, but are they better than simply predicting no change, and is the error mostly systematic bias or random noise?

우리 예측이 그럴듯해 보이는데, 그냥 지난 값이 그대로라고 예측하는 것보다 나은가요? 오차는 주로 체계적 편향인가요, 무작위 잡음인가요?

Compute U1 = RMSE divided by the sum of the root mean squares of actuals and forecasts, and U2 comparing relative forecast errors with those of the no-change forecast (U2 < 1 means better than naive). Then split the MSE into the bias share U^M, the variance share U^S and the unsystematic covariance share U^C; good forecasts have most of the error in U^C.

When to use Theil's U Forecast Accuracy Statistics

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

Over [value] periods Theil's U1 = [value] and U2 = [value]; the MSE split into bias [value], variance [value] and covariance [value] proportions.

Related methods

How this method is validated

이 방법의 검증 근거

  • Independent computation. 1 reference test compares the results with direct computations (formulas, enumeration or simulation) at a stated tolerance of 1e-12.

    독립 계산. 직접 계산(식·열거·모의실험) 대조 참조 시험 1건 통과(허용오차 1e-12).

Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.

허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.

Run Theil's U Forecast Accuracy Statistics on Quorant

Data you need
a table (CSV or Excel) with a time variable, an outcome variable and predictor (feature) columns
Price
150 credits for one analysis up to 10,000 rows (complexity level 1); larger or wider data costs more. Optional methodologist review: 900 credits.
Checking
Compared with independent computations
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q53081 · Reviewed 2026-10-25