Skip to content

Methods · Meta-analysis · Cumulative evidence

Trial Sequential Analysis

Trial sequential analysis treats a cumulative meta-analysis like an interim-monitored trial, comparing the cumulative Z-curve with alpha-spending boundaries relative to a required information size.

순차 시험 분석은 누적 메타분석을 중간 분석이 반복되는 시험처럼 보고, 누적 Z 곡선을 필요 정보량에 맞춘 알파 소비 경계와 비교하는 방법입니다.

My meta-analysis is significant but includes only a few small trials; is the evidence conclusive or could it be a false positive from repeated updating?

메타분석 결과가 유의하지만 작은 시험 몇 개뿐입니다. 근거가 확정적인지, 반복 갱신으로 생긴 위양성일 수 있는지 어떻게 판단하나요?

The required information size is computed from the anticipated effect, α and power and inflated for heterogeneity (diversity D²); accrued information is the cumulative inverse variance in study order. The cumulative random-effects Z-curve is compared with Lan-DeMets O'Brien-Fleming monitoring boundaries and non-binding futility boundaries to classify the evidence as firm, futile or inconclusive.

When to use Trial Sequential Analysis

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

Trial sequential analysis (α = [value], power = [value], anticipated effect [value], D² = [value]%) gave a required information size of [value]; [value]% was accrued and the final cumulative Z was [value] against a boundary of [value].

Related methods

How this method is validated

이 방법의 검증 근거

  • Automated tests. Checked by automated run tests; no external reference comparison is recorded yet.

    자동 시험. 자동 실행 시험을 거칩니다. 외부 참조값과 대조한 기록은 아직 없습니다.

Run Trial Sequential Analysis on Quorant

Data you need
a table (CSV or Excel) with an outcome variable and predictor (feature) columns
Price
600 credits for one analysis up to 10,000 rows (complexity level 4); larger or wider data costs more. Optional methodologist review: 2400 credits.
Checking
Automated run tests; no external reference comparison yet
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q82018 · Reviewed 2026-10-25