Skip to content

Methods · Quality control · Statistical process control

Acceptance Control Chart

An acceptance control chart places the limits for subgroup means from the specification limits rather than from the process's own spread. It is meant for highly capable processes, where the mean may wander a little without producing nonconforming parts: a subgroup is rejected only when its mean indicates that the fraction outside specification may exceed an acceptable process level.

합격 관리도는 부분군 평균의 관리한계를 공정의 산포가 아니라 규격한계에서 정합니다. 규격에 비해 산포가 매우 작은 공정을 위한 것으로, 평균이 조금 움직여도 부적합품이 생기지 않으므로 부적합률이 허용 공정 수준을 넘을 수 있다고 보일 때만 부분군을 불합격으로 판정합니다.

My process is far more capable than the specification requires; how far can the mean move before I should act, given the fraction nonconforming I am willing to accept?

공정 능력이 규격보다 훨씬 좋을 때, 허용할 수 있는 부적합률을 기준으로 평균이 어디까지 움직이면 조치해야 합니까?

The method returns the upper and lower acceptance control limits for each subgroup size, the largest and smallest acceptable process means, the probability of rejecting a process at the acceptable level and of accepting one at the rejectable level, the subgroup size that meets both risks, and the subgroups that fall outside the limits.

When to use Acceptance Control Chart

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

An acceptance control chart with an acceptable process level of [value] fraction nonconforming and alpha = [value] gave UACL = [value]; [value] of [value] subgroup means exceeded it.

Related methods

How this method is validated

이 방법의 검증 근거

  • Independent computation. 1 reference test compares the results with direct computations (formulas, enumeration or simulation) at a stated tolerance of 1e-9.

    독립 계산. 직접 계산(식·열거·모의실험) 대조 참조 시험 1건 통과(허용오차 1e-9).

Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.

허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.

Run Acceptance Control Chart on Quorant

Data you need
a table (CSV or Excel) with a time variable and an outcome variable
Price
250 credits for one analysis up to 10,000 rows (complexity level 2); larger or wider data costs more. Optional methodologist review: 1200 credits.
Checking
Compared with independent computations
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q01010 · Reviewed 2026-10-25