Skip to content

Methods · Time series · Forecasting · Croston Intermittent Demand Forecasting

Intermittent Demand by Temporal Aggregation (ADIDA)

Intermittent demand forecasting by temporal aggregation (ADIDA): demand is summed over coarser buckets, forecast there, and spread back.

시간 집계에 의한 간헐 수요 예측(ADIDA) — 수요를 더 긴 구간으로 합쳐 예측한 뒤 다시 나누는 시간 집계(ADIDA) 간헐 수요 예측입니다.

Runs Croston Intermittent Demand Forecasting with: adida set to “on”.

기본 방법(Croston Intermittent Demand Forecasting)에 다음 설정을 고정해 실행합니다: adida = on.

Weekly demand is mostly zero; would forecasting at a monthly level help?

주별 수요가 대부분 0인데, 월 단위로 예측하면 도움이 될까요?

Aggregation reduces intermittency so standard smoothing works, and the forecast is then disaggregated. Behind it is Croston Intermittent Demand Forecasting with adida = true already set; checks and report are the same as for Croston Intermittent Demand Forecasting.

When to use Intermittent Demand by Temporal Aggregation (ADIDA)

When to use something else

What you still provide

Assumptions and requirements

The same as for Croston Intermittent Demand Forecasting:

What the analysis reports

The output of Croston Intermittent Demand Forecasting, with the preset shown in the settings:

How this is validated

검증 근거

This variant runs the same engine as Croston Intermittent Demand Forecasting with the settings above fixed, so the evidence is that method’s: compared with independent computations. No separate checks of this preset are claimed. Read the base method’s validation record.

이 설정 묶음은 Croston Intermittent Demand Forecasting와 같은 엔진으로 돕니다. 검증 근거는 기본 방법의 것이며, 이 설정만 따로 검증했다고 주장하지 않습니다.

Other variants of Croston Intermittent Demand Forecasting

Run this variant

Data you need
a table (CSV or Excel) with a time variable and an outcome variable
Price
Same as Croston Intermittent Demand Forecasting: 250 credits for one analysis up to 10,000 rows (complexity level 2); larger or wider data costs more. Optional methodologist review: 1200 credits.
Checking
Compared with independent computations, as recorded for Croston Intermittent Demand Forecasting (see its checks)
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Preset ID Q53022-V02 · Variant of Q53022 · Reviewed 2026-10-25