Intermittent Demand by Temporal Aggregation (ADIDA)
Intermittent demand forecasting by temporal aggregation (ADIDA): demand is summed over coarser buckets, forecast there, and spread back.
시간 집계에 의한 간헐 수요 예측(ADIDA) — 수요를 더 긴 구간으로 합쳐 예측한 뒤 다시 나누는 시간 집계(ADIDA) 간헐 수요 예측입니다.
Runs Croston Intermittent Demand Forecasting with: adida set to “on”.
기본 방법(Croston Intermittent Demand Forecasting)에 다음 설정을 고정해 실행합니다: adida = on.
Weekly demand is mostly zero; would forecasting at a monthly level help?
주별 수요가 대부분 0인데, 월 단위로 예측하면 도움이 될까요?
Aggregation reduces intermittency so standard smoothing works, and the forecast is then disaggregated. Behind it is Croston Intermittent Demand Forecasting with adida = true already set; checks and report are the same as for Croston Intermittent Demand Forecasting.
When to use Intermittent Demand by Temporal Aggregation (ADIDA)
- Very sparse demand at the base frequency.
- You want a simple way to reduce intermittency.
When to use something else
- The timing within aggregation buckets matters for decisions.
- You want to try other settings side by side; open Croston Intermittent Demand Forecasting and set the options yourself.
What you still provide
- Data: a table (CSV or Excel) with a time variable and an outcome variable.
Assumptions and requirements
The same as for Croston Intermittent Demand Forecasting:
- Demand sizes and intervals are independent.
- Non-negative demand.
- A stationary demand process.
What the analysis reports
The output of Croston Intermittent Demand Forecasting, with the preset shown in the settings:
- Croston and SBA demand rate per period
- Smoothed demand size and interval
- ADI and CV² demand classification
- In-sample mean absolute error
- Optional TSB (Teunter-Syntetos-Babai) forecast with a per-period demand probability
- Optional ADIDA forecast from the temporally aggregated series
How this is validated
검증 근거
This variant runs the same engine as Croston Intermittent Demand Forecasting with the settings above fixed, so the evidence is that method’s: compared with independent computations. No separate checks of this preset are claimed. Read the base method’s validation record.
이 설정 묶음은 Croston Intermittent Demand Forecasting와 같은 엔진으로 돕니다. 검증 근거는 기본 방법의 것이며, 이 설정만 따로 검증했다고 주장하지 않습니다.
Other variants of Croston Intermittent Demand Forecasting
Run this variant
- Data you need
- a table (CSV or Excel) with a time variable and an outcome variable
- Price
- Same as Croston Intermittent Demand Forecasting: 250 credits for one analysis up to 10,000 rows (complexity level 2); larger or wider data costs more. Optional methodologist review: 1200 credits.
- Checking
- Compared with independent computations, as recorded for Croston Intermittent Demand Forecasting (see its checks)
- Before you pay
- A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.