Intermittent Demand with Obsolescence (TSB)
Intermittent demand forecasting by the Teunter–Syntetos–Babai method, which updates the probability of demand every period and so reflects items becoming obsolete.
진부화를 반영한 간헐 수요 예측(TSB) — 수요 확률을 매 기간 갱신해 품목의 진부화를 반영하는 Teunter–Syntetos–Babai 간헐 수요 예측입니다.
Runs Croston Intermittent Demand Forecasting with: tsb set to “on”.
기본 방법(Croston Intermittent Demand Forecasting)에 다음 설정을 고정해 실행합니다: tsb = on.
Some spare parts stop selling altogether; Croston keeps forecasting demand. What should I use?
일부 예비 부품은 아예 안 팔리게 되는데, Croston은 계속 수요를 예측해요. 무엇을 써야 하나요?
TSB lowers the demand probability in periods with no demand, so forecasts decay toward zero. The entry fixes tsb = true in Croston Intermittent Demand Forecasting; the rest of the output follows Croston Intermittent Demand Forecasting.
When to use Intermittent Demand with Obsolescence (TSB)
- Items may become obsolete.
- Long runs of zero demand are informative.
When to use something else
- Demand is stable but sporadic; Croston or SBA is enough.
- You want to compare this setting with the alternatives; run Croston Intermittent Demand Forecasting with each option.
What you still provide
- Data: a table (CSV or Excel) with a time variable and an outcome variable.
Assumptions and requirements
The same as for Croston Intermittent Demand Forecasting:
- Demand sizes and intervals are independent.
- Non-negative demand.
- A stationary demand process.
What the analysis reports
The output of Croston Intermittent Demand Forecasting, with the preset shown in the settings:
- Croston and SBA demand rate per period
- Smoothed demand size and interval
- ADI and CV² demand classification
- In-sample mean absolute error
- Optional TSB (Teunter-Syntetos-Babai) forecast with a per-period demand probability
- Optional ADIDA forecast from the temporally aggregated series
How this is validated
검증 근거
This variant runs the same engine as Croston Intermittent Demand Forecasting with the settings above fixed, so the evidence is that method’s: compared with independent computations. No separate checks of this preset are claimed. Read the base method’s validation record.
이 설정 묶음은 Croston Intermittent Demand Forecasting와 같은 엔진으로 돕니다. 검증 근거는 기본 방법의 것이며, 이 설정만 따로 검증했다고 주장하지 않습니다.
Other variants of Croston Intermittent Demand Forecasting
Run this variant
- Data you need
- a table (CSV or Excel) with a time variable and an outcome variable
- Price
- Same as Croston Intermittent Demand Forecasting: 250 credits for one analysis up to 10,000 rows (complexity level 2); larger or wider data costs more. Optional methodologist review: 1200 credits.
- Checking
- Compared with independent computations, as recorded for Croston Intermittent Demand Forecasting (see its checks)
- Before you pay
- A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.