Skip to content

Methods · Quality control · Statistical process control

Pre-Control Chart

Pre-control is a simple shop-floor rule for running a process against its specification limits. The tolerance is divided into a green zone (its middle half), two yellow zones (the outer quarters) and red zones outside the specifications. A process qualifies after five consecutive green units; afterwards pairs of units are checked, and two yellows on the same side, yellows on opposite sides or any red stop the process for adjustment and requalification.

사전관리는 규격한계를 기준으로 공정을 운영하는 간단한 현장 규칙입니다. 공차를 가운데 절반인 녹색 구역, 바깥쪽 4분의 1씩인 황색 구역, 규격 밖인 적색 구역으로 나눕니다. 녹색이 다섯 번 연속 나오면 공정이 적격이 되고, 이후 두 개씩 확인해 같은 쪽 황색 두 개, 반대쪽 황색, 또는 적색이 하나라도 나오면 공정을 멈추고 조정한 뒤 다시 적격 판정을 받습니다.

Following the pre-control rules, when should my operators have stopped or adjusted the process, and how often would a process like mine be stopped?

사전관리 규칙을 따랐다면 언제 공정을 멈추거나 조정했어야 하며, 이런 공정은 얼마나 자주 멈추게 됩니까?

The method returns the zone of every unit, the qualification and running decisions in order, counts of qualifications, continued pairs and stops by reason, and, under a normal process with the observed mean and standard deviation, the zone probabilities, the probability that a pair continues and the expected number of pairs between stops.

When to use Pre-Control Chart

When to use something else

Assumptions and requirements

What the analysis reports

How to report it

Pre-control (specification [value] to [value]) qualified [value] times; of [value] running pairs, [value] continued and [value] stopped.

Related methods

How this method is validated

이 방법의 검증 근거

  • Independent computation. 2 reference tests compare the results with direct computations (formulas, enumeration or simulation).

    독립 계산. 직접 계산(식·열거·모의실험) 대조 참조 시험 2건 통과.

Tolerances are relative differences (absolute differences for values near zero). R comparisons and reference tests are re-run before each release of the analysis engine.

허용오차는 상대 차이입니다(0 근처 값은 절대 차이). R 대조와 참조 시험은 분석 엔진을 배포할 때마다 다시 돌립니다.

Run Pre-Control Chart on Quorant

Data you need
a table (CSV or Excel) with a time variable and an outcome variable
Price
150 credits for one analysis up to 10,000 rows (complexity level 1); larger or wider data costs more. Optional methodologist review: 900 credits.
Checking
Compared with independent computations
Before you pay
A free pre-analysis diagnosis checks your data and gives an exact quote; nothing is deducted until you approve it.

Method ID Q01021 · Reviewed 2026-10-25