Single-Machine Sequencing to Minimise Late Jobs
Single-machine sequencing by the Moore–Hodgson algorithm, which minimises the number of late jobs.
지연 작업 수 최소화 단일 기계 일정 — 지연 작업 수를 최소화하는 Moore–Hodgson 알고리즘으로 단일 기계 일정을 정합니다.
Runs Machine scheduling calculator with: problem set to “single_machine”; rule set to “moore_hodgson”.
기본 방법(Machine scheduling calculator)에 다음 설정을 고정해 실행합니다: problem = single_machine; rule = moore_hodgson.
How do I schedule so that as few orders as possible miss their due date?
납기를 놓치는 주문이 가장 적도록 일정을 짜려면?
Moore–Hodgson builds an EDD sequence and removes the longest job whenever one becomes late. It is the Machine scheduling calculator with problem = single_machine, rule = moore_hodgson already filled in.
When to use Single-Machine Sequencing to Minimise Late Jobs
- Counting late jobs is the objective.
- One machine.
When to use something else
- Lateness magnitude matters; EDD minimises maximum lateness.
- You need a different value for problem, rule; use the Machine scheduling calculator directly.
What you still provide
- Data: the summary numbers the calculator asks for; no data file.
How this is validated
검증 근거
This preset fills in settings of the Machine scheduling calculator; the calculation is that calculator’s. No separate checks of this preset are claimed.
이 설정 묶음은 Machine scheduling calculator의 설정을 채워 둔 것입니다. 계산은 그 계산기와 같으며, 이 설정만 따로 검증했다고 주장하지 않습니다.
Other variants of Machine scheduling calculator
- Flow-Shop Sequencing (CDS Heuristic)
- Flow-Shop Sequencing (NEH Insertion)
- Single-Machine Sequencing by Due Date
- Single-Machine Sequencing by Weighted Shortest Time
- Two-Machine Flow-Shop Sequencing (Johnson's Rule)
Run this variant
- Data you need
- the summary numbers the calculator asks for; no data file
- Price
- Free in the browser calculator; no credits are used.
- Checking
- Uses the same calculator as the Machine scheduling calculator; no separate validation record is published for this preset.