Two-Machine Flow-Shop Sequencing (Johnson's Rule)

Two-machine flow-shop sequencing by Johnson's rule, which is optimal for makespan.

2기계 흐름작업장 순서 결정(Johnson 규칙) — 총 완료 시간에 최적인 Johnson 규칙으로 2기계 흐름작업장 순서를 정합니다.

Runs Machine scheduling calculator with: problem set to “two_machine_flow_shop”; rule set to “johnson”.

기본 방법(Machine scheduling calculator)에 다음 설정을 고정해 실행합니다: problem = two_machine_flow_shop; rule = johnson.

Every job goes through cutting then painting; what order finishes soonest?

모든 작업이 절단 뒤 도색을 거치는데, 가장 빨리 끝나는 순서는?

Johnson's rule places short first-machine jobs early and short second-machine jobs late. Behind it is the Machine scheduling calculator with problem = two_machine_flow_shop, rule = johnson set; the other inputs work as usual.

When to use Two-Machine Flow-Shop Sequencing (Johnson's Rule)

When to use something else

What you still provide

How this is validated

검증 근거

This preset fills in settings of the Machine scheduling calculator; the calculation is that calculator’s. No separate checks of this preset are claimed.

이 설정 묶음은 Machine scheduling calculator의 설정을 채워 둔 것입니다. 계산은 그 계산기와 같으며, 이 설정만 따로 검증했다고 주장하지 않습니다.

Other variants of Machine scheduling calculator

Run this variant

Data you need
the summary numbers the calculator asks for; no data file
Price
Free in the browser calculator; no credits are used.
Checking
Uses the same calculator as the Machine scheduling calculator; no separate validation record is published for this preset.

Reviewed 2026-10-25