Two-Machine Flow-Shop Sequencing (Johnson's Rule)
Two-machine flow-shop sequencing by Johnson's rule, which is optimal for makespan.
2기계 흐름작업장 순서 결정(Johnson 규칙) — 총 완료 시간에 최적인 Johnson 규칙으로 2기계 흐름작업장 순서를 정합니다.
Runs Machine scheduling calculator with: problem set to “two_machine_flow_shop”; rule set to “johnson”.
기본 방법(Machine scheduling calculator)에 다음 설정을 고정해 실행합니다: problem = two_machine_flow_shop; rule = johnson.
Every job goes through cutting then painting; what order finishes soonest?
모든 작업이 절단 뒤 도색을 거치는데, 가장 빨리 끝나는 순서는?
Johnson's rule places short first-machine jobs early and short second-machine jobs late. Behind it is the Machine scheduling calculator with problem = two_machine_flow_shop, rule = johnson set; the other inputs work as usual.
When to use Two-Machine Flow-Shop Sequencing (Johnson's Rule)
- Exactly two machines in series.
- Same order for all jobs.
When to use something else
- More than two machines; use NEH or CDS.
- You would rather keep every option open; the Machine scheduling calculator gives you the full set.
What you still provide
- Data: the summary numbers the calculator asks for; no data file.
How this is validated
검증 근거
This preset fills in settings of the Machine scheduling calculator; the calculation is that calculator’s. No separate checks of this preset are claimed.
이 설정 묶음은 Machine scheduling calculator의 설정을 채워 둔 것입니다. 계산은 그 계산기와 같으며, 이 설정만 따로 검증했다고 주장하지 않습니다.
Other variants of Machine scheduling calculator
- Flow-Shop Sequencing (CDS Heuristic)
- Flow-Shop Sequencing (NEH Insertion)
- Single-Machine Sequencing by Due Date
- Single-Machine Sequencing by Weighted Shortest Time
- Single-Machine Sequencing to Minimise Late Jobs
Run this variant
- Data you need
- the summary numbers the calculator asks for; no data file
- Price
- Free in the browser calculator; no credits are used.
- Checking
- Uses the same calculator as the Machine scheduling calculator; no separate validation record is published for this preset.